Lifting and setup of equipment inside a turbine needs approximately 40-45 minutes until its discovered not to be working due to cable damage.
Operators moving heavy tensioners from bolt to bolt get tangled with cables, pulling, cutting or damaging leading to delay and fatigue.
Need manpower to rope equipment up and down 20, 40 or 60 metres as damage cannot be fixed on site, costly repairs and transportation.